If deficiencies are identified, the local municipality may require repairs, follow-up documentation, or additional engineering evaluations within specified timelines.
Building Mavens can support associations throughout this process, including repair recommendations, permit coordination, follow-up inspections, and the preparation of any required engineering documentation until the municipality has accepted the final reports and inspection requirements have been satisfied.


