In this article: We explain which Boynton Beach buildings need recertification and when inspections are due. We cover the required structural and electrical inspections, what happens if Phase Two is needed, and how to submit reports to the City. You’ll also find steps to prepare and avoid common submission delays.
If you own, manage, or serve on the board of a building in Boynton Beach, building recertification may eventually become part of your responsibilities.
And when it does, there is quite a bit to keep track of.
Boynton Beach has its own Building Recertification Program, with requirements for which buildings need to be inspected, when inspections are due, what needs to be evaluated, and how reports must be submitted to the City.
Some of those requirements are easy to miss. Qualifying buildings need both structural and electrical inspections. Certain electrical systems require infrared thermography. And even a completed inspection report can run into delays if it isn’t submitted using the City’s required forms and file format.
In this guide, we’ll walk you through how Boynton Beach’s building recertification program works, what to expect once your building’s turn comes, and some of the details that can help you avoid unnecessary delays along the way.
A little background on Boynton Beach’s Building Recertification Program
Boynton Beach’s Building Recertification Program is relatively new. The City created it following the 2021 Surfside building collapse, using Miami-Dade County’s long-standing recertification program as a model.
Around the same time, Florida introduced the statewide Milestone Inspection law for qualifying condominium and cooperative buildings. But Boynton Beach’s local program isn’t simply another name for the state requirement.
For one, Palm Beach County does not have a countywide building recertification program comparable to Broward County’s. Certain municipalities, including Boynton Beach and Boca Raton, have their own local requirements.
Boynton Beach’s program goes beyond Florida’s statewide Milestone Inspection requirements in several ways. It covers certain threshold buildings in addition to qualifying condominiums and cooperatives, and it requires electrical as well as structural inspections. Qualifying buildings in Boynton Beach undergo their first recertification at 25 years and every 10 years thereafter.
You may still see the City use both “building recertification” and “milestone inspection” in its own information and forms. That can be confusing. For a property owner or association in Boynton Beach, the important thing is to understand the City’s local Building Recertification Program and the requirements that apply to your building.
Which Boynton Beach buildings need recertification?
Boynton Beach requires qualifying buildings to undergo their first recertification at 25 years, based on the date the building’s Certificate of Occupancy was issued. After that, recertification is required every 10 years.
The program includes two main groups of buildings:
Condominiums and cooperatives: Residential condominium and cooperative buildings that are three stories or more in height.
Threshold buildings: Buildings that meet Florida’s threshold-building criteria. This includes buildings greater than three stories or 50 feet in height, as well as certain assembly-occupancy buildings based on their size and occupant capacity. This means Boynton Beach recertification isn’t only a condominium issue. Commercial and other properties can qualify as well.
There are exceptions. Single-family, two-family and three-family homes, along with townhomes with three or fewer habitable stories above ground, are excluded. Certain school, university and government buildings are exempt as well.
How does the Boynton Beach recertification process start?
The City identifies buildings that meet its recertification requirements and sends the owner a written notice.
Boynton Beach sends that notice at least one year before the building’s recertification deadline. But that does not mean you have a full year after receiving it to complete Phase One.
Once you receive the notice, your first deadline starts: you have 180 calendar days to complete the Phase One inspections and submit the reports to the City.
Why does that advance notice matter? One practical way to look at the timeline is that the process can use much of that year if Phase Two becomes necessary. Phase One has a 180-day submission period after you receive the notice. If Phase Two is required, the Phase Two report must then be submitted within another 180 days after the Phase One report is submitted.
So even though your first task is Phase One, it makes sense to think about recertification as a process rather than one inspection appointment.
BUILDING MAVENS
Questions about your building’s next step?
Get clarity from a licensed engineer. Share your name and email, and our team will follow up to help you understand your inspection requirements and options.
What happens after you receive a Boynton Beach recertification notice?
Step 1: Review the notice and your deadline
Start by confirming which building is being recertified and when your Phase One reports are due.
This is particularly important for properties with multiple buildings. Boynton Beach requires separate recertification reports and uploads for each building rather than allowing multiple buildings to be combined into one submission.
Step 2: Hire the right inspection team
The City’s structural and electrical recertification reports must be completed under the responsibility of a Florida-licensed architect or professional engineer. Boynton Beach also allows the inspection services to be provided by a team of professionals, with the architect or engineer acting as the registered design professional in responsible charge and the appropriate professionals signing and sealing their work.
Don’t wait until late in the 180-day window to start looking for a team to handle your Building Safety and Recertification Inspections. The site inspections are only one part of the process. Your engineers need time to review available building information, conduct the inspections, prepare the City’s required reports and address anything that may need further investigation.
It also helps to choose a team that can handle the different parts of the inspection without sending you back and forth between several providers. If your electrical system is 400 amps or greater, for example, Boynton Beach requires a infrared thermography inspection by a Level II or higher certified infrared thermographer with the experience specified by the City. Having that capability within the same team can make coordination much easier.
Step 3: Prepare for the inspections
A little preparation before inspection day can make the process easier.
Make sure your inspection team can access the areas and equipment they need to evaluate. Depending on the building, this may include roofs, balconies, electrical rooms and panels, parking areas, common areas and other structural or electrical components.
Gathering previous inspection reports, repair records, plans, permits and documentation of earlier structural or electrical work can provide useful background as well.
If your property has more than one building, Boynton Beach requires a site plan or survey showing the location of each building and clearly identifying the building covered by each recertification report.
Step 4: Complete the Phase One structural inspection
The structural Phase One inspection is a visual examination of the building’s habitable and non-habitable areas and its major structural components. The architect or engineer uses it to assess the building’s structural condition and determine whether there are signs of substantial structural deterioration that need further investigation.
Boynton Beach specifically requires all improved balconies and guardrails to be inspected during Phase One.
Not every crack, stain or imperfection automatically means there is a serious structural problem. The purpose is to identify conditions that affect the building’s safety and determine whether a more detailed Phase Two investigation is needed.
Step 5: Complete the Phase One electrical inspection
The electrical portion evaluates the building’s electrical service equipment, excluding individual unit panels.
If the inspection identifies deficiencies in the applicable electrical service equipment, Phase Two is required.
Step 6: Submit your Phase One reports
Boynton Beach is quite specific about report submission. You must use the City’s structural and electrical guideline reports, submit them as separate PDFs with verifiable digital signatures, and upload them through Sages Permits.
Each building requires a separate submission, and multi-building properties need a site plan or survey identifying the building covered by the report. The City charges a $400 submission fee, and it won’t begin reviewing the reports until payment has been processed.
Common reasons Boynton Beach reports get sent back
Getting the inspection done is one thing. Getting the report accepted by the City is another.
Based on the City’s guidance and what we’ve seen working with the Boynton Beach process, some of the reasons a report can get sent back are surprisingly simple.
1. The wrong forms were used
The City requires its own structural and electrical guideline reports. Your engineer can’t substitute a proprietary or company-specific report form.
2. Information is missing
All required sections of the City’s forms need to be completed, even when Phase One is otherwise approved.
3. The digital signature no longer works
This is an easy one to miss. If someone prints and scans a digitally signed report before uploading it, the verifiable digital signature can be lost.
4. Multiple buildings were combined
Each building needs its own reports and upload. On a multi-building property, the site plan or survey must clearly identify which building each submission covers.
BUILDING MAVENS
Questions about your building’s next step?
Whether you’re addressing an immediate concern or planning ahead, our licensed engineers can help you understand your property’s needs, determine the right next steps, and move forward with confidence.
Licensed engineers. Clear guidance. South Florida expertise.
What if Phase One finds a problem?
Finding a deficiency doesn’t automatically mean your building is unsafe or that everyone has to leave.
If Phase One identifies substantial structural deterioration or applicable electrical deficiencies, Boynton Beach requires a Phase Two inspection. The Phase Two report is due within 180 calendar days after the Phase One report is submitted and must include the required repair plan and schedule. Phase Two can include additional testing as needed to understand the extent of the problem.
If repairs are required, they will generally involve the appropriate contractor and permits, followed by another inspection by your architect or engineer. Once the required work and documentation are accepted, the City can issue the Certificate of Recertification.
One timing detail is worth confirming for your particular building: Boynton’s separate failed-report guidance also refers to a 180-day period from the first report for completing repairs and resubmitting. Your engineer and the City can confirm the exact repair deadline that applies once the findings are known.
Can you request an extension?
In certain circumstances, yes.
The Building Official can grant an extension of up to 60 days to submit a recertification report or obtain necessary permits. Your architect or engineer must submit the request and provide a signed and sealed statement confirming that the building can remain occupied while the recertification is underway.
Don’t treat that as an extra 60 days automatically built into your schedule, though. It’s an extension that has to be requested and approved.
How to prepare before your Boynton Beach recertification inspection
You don’t need to become a building expert before your engineer arrives. But there are a few things you can do to make the process easier.
- Start early. Don’t wait until you’re close to the 180-day deadline to begin contacting engineers.
- Gather what you already have. Previous structural and electrical reports, repair records, permits, plans and other building documentation can provide useful background.
- Plan access. Make sure your inspection team can get into the areas they need to inspect.
- Know whether thermography applies. If your electrical service equipment meets the City’s 400-amp threshold, make sure the required thermography is part of the inspection plan from the beginning.
- Think beyond the site visit. Ask how your engineer handles the City’s report forms, digital signatures, Sages submission requirements and responses to City comments.
- Leave room for the unexpected. If the inspection identifies something that needs further investigation or repair, you’ll be glad you didn’t start at the end of your deadline.
Frequently Asked Questions About Boynton Beach Building Recertification
Not exactly.
Florida’s statewide Milestone Inspection requirements apply to qualifying residential condominium and cooperative buildings and focus on structural safety. Boynton Beach has its own local Building Recertification Program, which covers certain threshold buildings as well and includes electrical inspection requirements.
The City’s own materials sometimes use both terms, which can make the distinction confusing. If your building falls under both sets of requirements, your engineer can help determine what needs to be inspected and submitted.
Some do.
Boynton Beach’s program includes buildings that meet Florida’s threshold-building criteria in addition to qualifying residential condominiums and cooperatives. Whether a commercial property qualifies depends on the characteristics and use of the building.
Yes. Boynton Beach’s local program includes an inspection of electrical service equipment, excluding individual unit panels.
No. It is required when the applicable electrical service equipment operates at 400 amps or greater. The thermography also has to be performed by a Level II or higher certified infrared thermographer who meets Boynton Beach’s experience requirements.
Not simply because it’s undergoing recertification.
This is a safety inspection of the building’s existing structural and electrical systems. If the inspection identifies repairs, however, some of that work may have to comply with current codes.
If your architect or engineer identifies substantial structural deterioration or applicable electrical deficiencies, you’ll move into Phase Two. That means further investigation where needed, followed by a repair plan and schedule if repairs are required.
Once the City accepts the required reports and any necessary repairs have been completed, you’ll receive a Certificate of Recertification. Your next recertification will be due 10 years later.
About the Author

Scott’s background is extensive, covering both public and private projects. He’s highly skilled in structural engineering design, construction oversight, and forensic analysis. This includes investigating structural failures, construction defects, and code compliance – all critical to maintaining safety and adhering to building codes. Beyond his investigative work, Scott is also an accomplished design engineer, contributing to various architectural elements from building envelope systems to designs for a wide range of structures. From the initial concept to the final inspection, Scott is dedicated to providing innovative and compliant engineering solutions.