If deficiencies are identified, the City may require repairs, follow-up documentation, or additional engineering evaluations. When repairs are required, a Repair Plan must be submitted within 30 days after the inspection report is accepted by the City.

Building Mavens can support associations throughout this process, including repair recommendations, permit coordination, follow-up inspections, and the preparation of any required engineering documentation until the City has accepted the final reports and inspection requirements have been satisfied.