During the first phase of a structural evaluation (Milestone Inspection) evaluation, a licensed architect or engineer will visually check both the living and non-living areas of a building, focusing on its main structural parts. They’ll provide a qualitative assessment about the building’s structural health. If they don’t find any serious structural issues, there’s no need for a second phase of inspection. The architect or engineer will then write and submit an official inspection report on their findings.
However, if substantial structural deterioration is uncovered during the first phase, a more in-depth second phase of inspection is needed. This next step may include either destructive or non-destructive testing, based on the inspector’s decision, to thoroughly evaluate any troubled areas to establish the safety level of the building and provide recommendations on how to fix any damage. The inspector will choose test areas that cause the least disruption and are easiest to fix, yet still provide a good overview of the building’s condition. If this second phase is needed, the architect or engineer must, within 180 days after the first phase report, send a progress report to the local enforcement agency outlining when they’ll finish the second phase. After completing the second phase, the inspector must prepare and submit a detailed inspection report.